Vancouver – April 21, 2021 – J. François Lalonde, President and CEO of Stellar AfricaGold Inc., (TSXV:SPX) (“Stellar” or the “Company”) is pleased to announce the results of Tichka Est, Zones A and B trenching program.
Stellar has successfully completed a 10-trench surface sampling on its 90% earn-in Tichka Est gold Project in Morocco. The trenching program, which totalled 175 linear metres, yielded grades as high as 3.36 g/t Au over 10.0 meters including an interval of 8.73 g/t Au over 3.0 meters in Zone A, and 4.55 g/t Au over 15 meters including an internal of 7.47 g/t Au over 6.0 meters in Zone B. The Zone B structure has been traced at surface for over 2 km along strike and is open at both ends while the Zone A structure has been traced for over 400 meters along strike and is also open at both ends.
Recent Comments